Project Name
Key Engineering Specifications
Scope of Execution
Executed to ISO safety protocols with precision surveying, heavy hydraulic machinery, and stringent quality assurance.
Five decades of landmark EPC delivery across 8 states — from twin tunnels 150 metres underground to high-speed BOT coal conveyors, defense runways, and multi-thousand kilometer water grids.
Twin 8.54 km headings, underground surge pool & five 145 MW pump stations 150 metres underground.
| Landmark Project & Engineering Scope | Sector & Vertical | Authority & Location | Scale & Inspect |
|---|---|---|---|
|
SH.00
Palamuru Lift Irrigation — Package 16
Twin 8.54 km headings, surge pool & five 145 MW pumps 150m deep |
|
Irrigation & CAD, Telangana
|
Live Site
8.54 km × 8.5m dia
Inspect
|
|
SH.01
Krishna DWSP Package-III
2,375 mm MS pumping main & lining across 12 km route |
|
HMWSSB
|
Completed
2,375 mm dia · 12 km
Inspect
|
|
SH.02
Aeronautical Test Range Runway
3 km × 45 m flexible runway & taxiway for DRDO |
|
CCE / DRDO
|
Completed
3,000 m × 45 m
Inspect
|
|
SH.03
Northern Port Coal Conveying (BOT)
12.5 km mechanized corridor at 5.3 m/s · Two 4,000 TPH lines |
|
Krishnapatnam Port (KPCL)
|
Completed
12.5 km · 4,000 TPH
Inspect
|
|
SH.04
Krishna Left Flood-Bank Highway
58.50 km double-lane embankment highway & flood armor |
|
Irrigation & CAD, A.P.
|
Completed
58.5 km Double Lane
Inspect
|
|
SH.05
Brahmaputra Petrochemical Complex
LLDPE/HDPE unit civil & structural refinery facilities |
|
BCPL
|
Completed
Polymer & C2+ Units
Inspect
|
|
SH.06
NALCO 4th Stream Refinery Expansion
Refinery civil, high-altitude grading and deep piling |
|
NALCO
|
Completed
4th Stream Upgrade
Inspect
|
|
SH.07
Mundra–Jetpur 400 kV Line Foundations
368 bored piles of 1,000 mm dia × 25m depth (3 mo ahead) |
|
Bridge & Roof / PGCIL
|
Completed
368 piles × 1,000mm
Inspect
|
|
SH.08
Jaipur Metro Elevated Stations
2 elevated interchange stations & 140 m viaducts |
|
Jaipur Metro Rail Corp
|
Completed
2 Stations · 140m Viaduct
Inspect
|
|
SH.09
NH-5 Flyover at Atmakur
800 m two-lane grade separator on national highway |
|
R&B Department, A.P.
|
Completed
800 m × 2 Lanes
Inspect
|
|
SH.10
HPCL SPM Marine Crude Tunnelling
Sub-sea NATM rock excavation for marine oil interface |
|
Hindustan Petroleum (HPCL)
|
Completed
NATM Sub-surface
Inspect
|
|
SH.11
Nellore Water Supply & 122 MLD WTP
122 MLD treatment plant, 18m intake well & 1,124 km grid |
|
HUDCO / Municipal Corp
|
Completed
122 MLD · 1,124 km
Inspect
|
|
SH.12
Dahej Petrochemical Utilities
Integrated civil & underground service corridors |
|
ONGC Petro Additions (OPAL)
|
Completed
Mega SEZ Package
Inspect
|
|
SH.13
Vizag Port Logistics Park (VPLP)
1,700 driven piles, container yard & rail siding network |
|
Vizag Port Logistics Ltd
|
Completed
1,700 Piles · Rail Line
Inspect
|
|
SH.14
HPCL Visakh Refinery Tank Piling
Bored cast-in-situ heavy foundations for 70m crude tanks |
|
Hindustan Petroleum (HPCL)
|
Completed
70m Tank Piles
Inspect
|
|
SH.15
Gangavaram Port Marine Conveyor Piling
2,122 marine piles of 600 mm dia down to 25m depth |
|
Gangavaram Port Ltd
|
Completed
2,122 Piles × 600mm
Inspect
|
|
SH.16
Delhi Metro Station Foundations
Kirti Nagar–Mundka (Phase II) & Karkarduma elevated station piling |
|
Delhi Metro (DMRC)
|
Completed
Phase II Stations
Inspect
|
Follow our serpentine trajectory from foundational canal excavations in 1976 through BOT mechanized ports to twin headings 150 metres deep today.
Our story begins in Andhra Pradesh with dedicated civil engineers and an unyielding commitment to timely execution.
Major civic breakthrough executing 122 MLD treatment facility, 38 km MS trunk lines and a 1,124 km distribution grid.
Expansion into heavy transportation with the 58.5 km protective river highway and DMRC Phase II deep station piling.
368 deep piles completed 3 months ahead for PGCIL, and integrated utilities on live petrochemical complexes in Gujarat.
Commissioning of RVR’s flagship Build-Operate-Transfer feat — a 12.5 km automated bulk coal handling artery at 5.3 m/s.
High-precision 3 km flexible pavement runway for DRDO's Aeronautical Test Range and elevated viaducts for Jaipur Metro.
Sub-surface marine crude-oil interface tunnel executed under complex coastal geology using the NATM method.
State-of-the-art cold storage hub, dual PEB warehouses, and 1,700 cast-in-situ piles supporting coastal logistics.
Twin 8.54 km headings (8.5 m dia), pump cavern & five 145 MW pump units sitting 150 metres deep beneath Telangana.
Transportation, high-head water mains, deep NATM tunnels, industrial PEB complexes, BOT conveyors or deep marine piling — the same execution culture on every plot.