Aeronautical Test Range runway
Civil works for a 3 km, 45 m-wide flexible runway and taxiway at Varavinakaval, Chitradurga — critical earthwork and high-precision pavement.
A construction and infrastructure company with five decades of execution across transportation, water supply, irrigation, tunnels, industrial structures, conveyors, marine works and electrical systems.
From ten people in Visakhapatnam to a national EPC force — transportation, water, irrigation, tunnels and industrial structures, executed with integrity.
Discover the journey
Led by the founder, the managing director and the board.
Founded by R Venkateswara Rao in 1976, RVR is a construction and infrastructure company known for quality and trust. In 2014 the 12.8 km Krishnapatnam coal conveyor marked our BOT entry.
We are keen on environment-friendly construction and the safety of the workers — and fully equipped for the opportunities heading our way.
21.5 km completed. Rock bolts, shotcrete, lining — caverns to 14 m.
2,122 piles at Gangavaram. 1,700 at Vizag logistics. Metro stations.
12.5 km Krishnapatnam coal handling at 5.3 m/s belt speed.
Substations, BMS, chillers and 50 km overhead on irrigation packages.
Civil works for a 3 km, 45 m-wide flexible runway and taxiway at Varavinakaval, Chitradurga — critical earthwork and high-precision pavement.
Manufacturing, laying and commissioning a 2,375 mm MS pumping main with cement-mortar lining from Godakondal to Gungal for HMWSSB.
Part design and construction of elevated stations at Metro Railway Station and Sindi Camp, including 140 m track-supporting viaducts.
Package 16, Stage IV — twin tunnels, underground pump house, five 145 MW pumps. Telangana.
Intake well, 18 m pump house, 38 km MS main and 1,124 km distribution under HUDCO.
“Design, construction and commissioning of the Krishnapatnam conveyor were completed in record time — a 12.5 km mechanized coal handling system that opened our BOT chapter.”Northern port coal conveying facilities · Krishnapatnam Port Company Limited · 2014
Write to the corporate office in Visakhapatnam. We will come back with a conversation, not a brochure.
Palamuru Package 16 — twin 8.54 km headings, surge pool and underground pump house.
HMWSSB Package-III and a 122 MLD WTP at Nellore under HUDCO.
How a 12.5 km conveyor at Krishnapatnam opened a new business line.
Commitments with integrity — the culture the chairman set in 1976.
Write to the corporate office in Visakhapatnam, or send the scope and we will come back with a conversation, not a brochure.